❌

Vue normale

Crusoe Walks Away From $1.25B Boom Turbine Deal as AI Power Race Intensifies

28 septembre 2026 à 07:33

Crusoe dropped Boom Supersonic’s $1.25B turbine deal while continuing to secure gas generation, batteries, and grid power for AI data centers.

The post Crusoe Walks Away From $1.25B Boom Turbine Deal as AI Power Race Intensifies appeared first on TechRepublic.

  • ✇Articles on TechRepublic
  • Malaysia Data Center Growth Surges as Johor Capacity Tightens
    Johor’s data center pipeline has reached 8,542 MW, but a 0.7% colocation vacancy rate, grid constraints, and water demand mean regional IT buyers need to separate announced capacity from infrastructure they can actually deploy. The post Malaysia Data Center Growth Surges as Johor Capacity Tightens appeared first on TechRepublic.
     

Malaysia Data Center Growth Surges as Johor Capacity Tightens

17 août 2026 à 08:37

Johor’s data center pipeline has reached 8,542 MW, but a 0.7% colocation vacancy rate, grid constraints, and water demand mean regional IT buyers need to separate announced capacity from infrastructure they can actually deploy.

The post Malaysia Data Center Growth Surges as Johor Capacity Tightens appeared first on TechRepublic.

❌